After completing the reboot, NIRISS telemetry data demonstrated normal timing, and to fully confirm, the team scheduled a test observation. On January 28, the Webb team sent commands to the instrument to perform the observation, and the results confirmed on January 30 NIRISS is back to full scientific operations. “NASA and CSA partnered to approach the problem as technically possible, using a detailed consideration of all areas of operation of the instrument. They analyzed all possible methods to safely recover the electronics. When performing the operation, reviews were held at each intermediate step. We are now happy to report that Webb’s NIRISS instrument is back online, and is performing optimally,” said Julie Van Campen, Webb Integrated Science Instrument Module (ISIM) systems engineer at NASA’s Goddard Space Flight Center in Greenbelt, Maryland.